South Shore Plaza - Braintree, MA
  • Installed pedestrian protection and temporary flooring throughout the open corridors of the Mall that allowed the contractor to install a second floor while first floor remained open for business.
  • Equipment used –Scaffold, Shoring, Aluminum Beams, Temporary Hanging Platform System, MicroLam Planks, Plywood and Stair Towers.
1
2