Opera House - Boston, MA
  • Scaffold installed in the auditorium of this historic landmark for total renovation.
  • Erected work platforms throughout for all construction trades.
  • Equipment used – engineering, sectional scaffold, putlogs, Microlam plank and ¾ fire rated plywood.
  • Highest point being 80 feet in height. This erection job had 700 sectional scaffold frames, approximately 100 putlogs, 1500 Microlam planks & 600 sheets of ¾ fire rated plywood.
1
2
3
4
5
6
7
8