| Opera House - Boston, MA |
- Scaffold installed in the auditorium of this historic landmark for total renovation.
- Erected work platforms throughout for all construction trades.
- Equipment used – engineering, sectional scaffold, putlogs, Microlam plank and ¾ fire rated plywood.
- Highest point being 80 feet in height. This erection job had 700 sectional scaffold frames, approximately 100 putlogs, 1500 Microlam planks & 600 sheets of ¾ fire rated plywood.
|
|
|